Engineering notes

Silicone engineering notes

Shorter notes from the shop floor — material choices, audit mechanics and design rules that come up often enough to write down.

These are shorter than the guides and more editorial: the reasoning behind a decision we make on the floor, written so a buyer or a designer can reuse it without reading a standard.

Working on something that is not covered here? A drawing gets you a DFM memo within 48 hours.

Start an RFQ