What certifications does Silicraft hold?
ISO 13485 (TÜV SÜD), ISO 9001 (BSI), FDA Registered (US FDA), LFGB (TÜV Rheinland), EU 1935/2004 (SGS), RoHS / REACH (Intertek), CE Marking (Self-declared + audited), IATF 16949 (SGS), Class 8 Cleanroom (Internal + third-party). Audits are annual, and we can forward a certificate with your NDA executed.
How quickly will I get a quote?
Send a STEP file, an IGES file or a hand sketch and our application engineer returns a DFM memo within 48 hours, followed by a quotation. Material options usually come back within one working day.
What drawing formats do you accept?
STEP, IGES, or a hand sketch — the RFQ form accepts drawings and photos directly, and an engineer reads every one of them.
How long does tooling take?
Tool design and T1 sampling take 10–14 days. T1 samples ship by air — typically 5–10 pieces — so you can run fit, finish and compliance testing before series production is released.
Where are your factories?
Shenzhen (Building 7, Silicon Park, Bao'an, Shenzhen 518101); Suzhou (Block C, Bio-Medical Zone, Suzhou Industrial Park 215123); Dongguan (12 Mould Avenue, Changping, Dongguan 523560). Shenzhen runs precision liquid silicone rubber, Suzhou runs the medical cleanroom, and Dongguan carries industrial-scale compression. We ship to 41 countries.